Need help booking?
Unpublished phone-only deals available
CRE to CPD: distance & flight time
North Myrtle Beach (Grand Strand Airport) → Coober Pedy (Coober Pedy Airport)
10,446 mi
16,812 km · 9,078 nm
20h 57m
estimated nonstop flight time
+13.5h
time difference · heading west
See live CRE→CPD fares Phone-only fares on this route — call free
Flight time details
10,446 miles nonstop takes roughly 20h 57m gate to gate, flying west. Add 45–90 minutes per connection if there's no nonstop service. Remember to factor the 13.5-hour time gain when reading arrival times on your ticket.
The two airports
- CRE — Grand Strand Airport · North Myrtle Beach, United States
- CPD — Coober Pedy Airport · Coober Pedy, Australia
Distances are great-circle ("as the crow flies") — the same basis airlines use for frequent-flyer miles.
Alternate airports can cut this fare
Flying from or into a nearby airport is the #1 trick our agents use to beat online prices. Call and we'll compare every combination on one call.
Near CRE
- MYR · Myrtle Beach International Airport15 mi away
- GGE · Georgetown County Airport49 mi away
- ILM · Wilmington International Airport57 mi away
- LBT · Lumberton Regional Airport58 mi away
Near CPD
- PXH · Prominent Hill Airport67 mi away
Frequently asked questions
How far is CRE from CPD?
The flight distance from North Myrtle Beach (CRE) to Coober Pedy (CPD) is 10,446 miles (16,812 km, 9,078 nautical miles), measured along the great-circle route airlines actually fly.
How long is the flight from CRE to CPD?
A nonstop flight takes about 20h 57m gate to gate. Actual time varies with winds, routing and season — eastbound transatlantic flights, for example, are usually faster than the return.
What is the time difference between North Myrtle Beach and Coober Pedy?
Coober Pedy is 13.5 hours ahead of North Myrtle Beach.
What is the cheapest way to fly from CRE to CPD?
Compare live fares online, then call CheapoTrav — our agents have unpublished consolidator fares on CRE–CPD that never appear on search engines, with no booking fees.