Need help booking?
Unpublished phone-only deals available
FAZ to SSC: distance & flight time
Fasa (Fasa Airport) → Sumter (Shaw Air Force Base)
7,162 mi
11,526 km · 6,224 nm
14h 31m
estimated nonstop flight time
-7.5h
time difference · heading northwest
See live FAZ→SSC fares Phone-only fares on this route — call free
Flight time details
7,162 miles nonstop takes roughly 14h 31m gate to gate, flying northwest. Add 45–90 minutes per connection if there's no nonstop service. Remember to factor the 7.5-hour time set-back when reading arrival times on your ticket.
The two airports
- FAZ — Fasa Airport · Fasa, Iran
- SSC — Shaw Air Force Base · Sumter, United States
Distances are great-circle ("as the crow flies") — the same basis airlines use for frequent-flyer miles.
Alternate airports can cut this fare
Flying from or into a nearby airport is the #1 trick our agents use to beat online prices. Call and we'll compare every combination on one call.
Near FAZ
- JAR · Jahrom Airport23 mi away
- SYZ · Shiraz Shahid Dastghaib International Airport82 mi away
- LRR · Lar Airport93 mi away
- LFM · Lamerd Airport110 mi away
Near SSC
- MMT · Mc Entire Joint National Guard Base19 mi away
- CDN · Woodward Field22 mi away
- CUB · Jim Hamilton L.B. Owens Airport30 mi away
- HVS · Hartsville Regional Airport36 mi away
Frequently asked questions
How far is FAZ from SSC?
The flight distance from Fasa (FAZ) to Sumter (SSC) is 7,162 miles (11,526 km, 6,224 nautical miles), measured along the great-circle route airlines actually fly.
How long is the flight from FAZ to SSC?
A nonstop flight takes about 14h 31m gate to gate. Actual time varies with winds, routing and season — eastbound transatlantic flights, for example, are usually faster than the return.
What is the time difference between Fasa and Sumter?
Sumter is 7.5 hours behind Fasa.
What is the cheapest way to fly from FAZ to SSC?
Compare live fares online, then call CheapoTrav — our agents have unpublished consolidator fares on FAZ–SSC that never appear on search engines, with no booking fees.