Need help booking?
Unpublished phone-only deals available
TMW to ACT: distance & flight time
Tamworth (Tamworth Airport) → Waco (Waco Regional Airport)
8,490 mi
13,664 km · 7,378 nm
17h 7m
estimated nonstop flight time
-15h
time difference · heading east
See live TMW→ACT fares Phone-only fares on this route — call free
Flight time details
8,490 miles nonstop takes roughly 17h 7m gate to gate, flying east. Add 45–90 minutes per connection if there's no nonstop service. Remember to factor the 15-hour time set-back when reading arrival times on your ticket.
The two airports
- TMW — Tamworth Airport · Tamworth, Australia
- ACT — Waco Regional Airport · Waco, United States
Distances are great-circle ("as the crow flies") — the same basis airlines use for frequent-flyer miles.
Alternate airports can cut this fare
Flying from or into a nearby airport is the #1 trick our agents use to beat online prices. Call and we'll compare every combination on one call.
Near TMW
- GUH · Gunnedah Airport36 mi away
- ARM · Armidale Airport60 mi away
- NSO · Scone Airport66 mi away
- NAA · Narrabri Airport80 mi away
Near ACT
- CNW · TSTC Waco Airport9 mi away
- TPL · Draughon Miller Central Texas Regional Airport33 mi away
- HLR · Hood Army Air Field43 mi away
- DFW · Dallas Fort Worth International Airport90 mi away
Frequently asked questions
How far is TMW from ACT?
The flight distance from Tamworth (TMW) to Waco (ACT) is 8,490 miles (13,664 km, 7,378 nautical miles), measured along the great-circle route airlines actually fly.
How long is the flight from TMW to ACT?
A nonstop flight takes about 17h 7m gate to gate. Actual time varies with winds, routing and season — eastbound transatlantic flights, for example, are usually faster than the return.
What is the time difference between Tamworth and Waco?
Waco is 15 hours behind Tamworth.
What is the cheapest way to fly from TMW to ACT?
Compare live fares online, then call CheapoTrav — our agents have unpublished consolidator fares on TMW–ACT that never appear on search engines, with no booking fees.